Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the puca domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jq91n3h2q0lm/public_html/wp-includes/functions.php on line 6121
2005 - 2007 - Can Tho Bridge Project - Quân Thái

Contractor. Bachy Soletanche Vietnam Group

Supply: Equipments; Hand tools ; Hardware consumable ; Marine transportation service.