Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the puca domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/jq91n3h2q0lm/public_html/wp-includes/functions.php on line 6121
STAKABLE CONVERYOR - Quân Thái

STAKABLE CONVERYOR

Description

All the muck has to be removed from the work site on most tunneling projects. Environmental restrictions often demand it. Also, in urban environments, there are frequently limitations regarding the hours during which muck hauling trucks are allowed to be driven from the site. The result is if you want your TBM running 24 hours a day, then you have to find a way to store the muck on site.

With Robbins stacker conveyors, we can store as much muck as your job site will physically hold. Robbins supplies a range of stacker conveyor designs, from a simple fixed incline conveyor to a cable-stayed radial stacker with the capacity to store the muck from several days of tunneling production. Also, we can provide various options such as maintenance walkways and wind screens to minimize dust.